Quality, Safety and Field Accountability
Gradford Construction treats quality control, safety planning, documentation, and turnover as active project responsibilities throughout construction.
Accountability built into the work
Quality and safety are not separate from production. From pre-task planning through system turnover, Gradford Construction verifies conditions, documents its work, and corrects nonconformances as construction progresses.
Gradford Construction performs internal quality-control checks on its own installations and coordinates with the owner's or project's designated inspectors and independent testing agencies for third-party inspection and acceptance. Gradford Construction does not act as the independent inspector of its own work.
How we manage quality and safety
Safety Planning
- Project-specific safety planning
- Job hazard analysis
- Pre-task planning
Welding & Materials
- Welding procedures
- Welder qualification documentation
- Material verification
Internal Quality Control
- Drawing and specification compliance
- Field measurements
- Fit-up and installation checks
- Inspection of Gradford Construction's own work
- Nonconformance correction
Inspection Coordination
- Coordination with project inspectors and testing agencies
- Weld inspection coordination
- Pressure-test documentation
Documentation & Records
- Photo documentation
- Daily field records
- Punch-list management
Closeout & Turnover
- As-built information
- Closeout and turnover packages
- System turnover documentation